About the project

  • Date: April 2025
  • Client: Ikoyi Club 1938
  • Category:
  • Address: Ikoyi, Lgaos State
Ikoyo Club 1938 installed this off-grid system for low power demand hours and security needs.

Benefits of Project

Ikoyi Club 1938 installed this off-grid system for low power demand hours and security needs.

Technologies Deployed

With a mixed range of products from our trusted suppliers, our balance of systems and technical expertise are second to none.  We stay in tandem with the industry advancements and ensure all systems sourced are backed-up with rigid/simple warranty terms. Major balance of systems includes,

  • 77 By 630 Watts Jinko Solar Panels  Modules
  • Fronius Eco 27KW BY 3
  • Racking: Roof Mounted
  • Keepouts: 2 Segments
  • Battery Capacity 96.2 KWH